JSC «Verkhnebakansky Cement Plant»
JSC «Verkhnebakansky Cement Plant»: transportation of equipment.
Features of the project:
transportation in the city of Novorossiysk with a large height and weight. To overcome the bridge, the fly-over installation method was chosen, in which the structure was supported on the bridge supports, and the load on the bridge surface did not exceed the permissible one.- Specifications
Route | |
Place of loading | NLE, Novorossiysk, Krasnodar region |
Place of unloading | Verkhnebakansky cement plant, v. Verkhnebakansky, Krasnodar region |
Length of route | 100 km |
Cargo characteristics | |
Weight | of the first road train: 161 t; The second road train: 68 t |
Length | of the first road train: 18.7 m; Second road train: 6 m |
Diameter | first road train: 5.4 m; Second road train: 5.9 m |
Road train height with cargo | First road train: 6.5 m; Second road train: 6.5 m |